Projects
Row Code Title Scope of Works/Services Client Date Photo
1 118 Deylam & Bidboland Gas Compressor Stations Deylam & Bidboland Gas Compressor Stations

Procurement , construction , Instalaition and commissioning of Iranian Gas Trunk Pipeline (IGAT6) Deylam & Bidboland Gas compressor stations .The capacity is delivering and boosting natural gas by 110 milion cubic meter .Duration of project is 19 Mounths and located in Bousher & Ahwaz .
IGEDC 2016
2 117 Danan Oil Field Development Danan Oil Field Development

Procurement, Construction, Installation of Danan Separation Area included Gas transportation line to Dehloran Gas Compressor station, Duration of project is 18 months, and it is located in Dehloran City, in Ilam province.
Iranian Central Oil Fields Company (ICOFC) 2015
3 116 Procurement of Khangiran wellhead facilities and pipeline (E034S) and (E120s) Procurement of Khangiran wellhead facilities and pipeline

Arya Petro Gas Global Co. has successfully achieved to conclude a new contract for Procurement and Construction (PC) of Khangiran well head facilities and pipeline with Iranian Central Oil Field Co (ICOFC). Duration of project is about 12 months, and it is located in Khangiran City, in Khorasan province. Scope of work included procurement of Khangiran well head facilities and construction of 8'' underground pipeline.
Iranian Central Oil field CO. 2014 .
4 115 Procurement of Tabnak wellhead facilities and pipeline Project Procurement of Tabnak wellhead facilities and pipeline

Scope of work included procurement and construction of Tabnak wellhead facilities and underground pipeline with dimension of 8 inches.
Iranian Central Oil field CO. 2014
5 114 Sirjan Pipeline, Reducing & Metering Stations Project Sirjan Pipeline, Reducing & Metering Stations Project

Procurement and Supply of Equipment & Materials and Construction of 46 K.M of Pipeline with specification of 2" to 24" along with Procurement & Construction of 13 reduction & metering stations.
Gohar Energy Sirjan Co. 2013
6 113 Yadavaran Oil Field Development Engineering & Procurement of Diesel Generator, Pig launcher & Receiver, Wellhead Control Panel & Multi phase flow meter (Provision of Early Production System Long Lead Items & Service)

The Yadavaran oil field is in south western Iran near the Iraq border. It will be developed from two gathering manifold sites.
The EPS will include the drilling and hooking-up of 8 wells via 8'' buried flow lines to manifolds located at Khusk and Hosseinieh (4 wells per manifold). An above ground 10 km x 12'' infield line from each manifold will be connected to the GOSU/CTEP area where the two lines will be joined via a pig gable ''Y'' piece to a 12'' above ground pipeline to a termination point some 500 meters from the boundary fence of the existing facility located some 45km south east of Yadavaran.
Arya Petro Gas scope of work includes engineering, procurement, commissioning, start-up and training of client personnel for Diesel Generator, Pig launcher & Receiver, Multiphase Flow Meter, Wellhead Control Panel of Yadavaran oil field project.
Sinopec/PEDEC 2010 .
7 112 Yadavaran Oil Field Development Engineering & Procurement of Pressure vessel needed for Yadavaran Oil Field Development (Phase one)

The Yadavaran oil field is in south western Iran near the Iraq border. It will be developed from two gathering manifold sites. The produced crude will be transported to a Gas/Oil Separation Unit and Central Treatment Export Plant (GOSU/CTEP). The crudes (heavy and light oil) are processed separately. The processed crudes and excess gas will be exported separately to the Ahwaz Booster Station (ABS) and a tie-in point near ABS respectively about 100km away.
Arya Petro Gas scope of work includes engineering, procurement, commissioning, and start-up of pressure vessel of Yadavaran oil field project.
Sinopec/PEDEC 2010 .
8 111 Kish Gas Refinery (EP) Engineering & Procurement of Centrifugal Compressors, Reciprocating Compressors, Centrifugal Pumps, Reciprocating Pumps, Fire Water Pumps , Fuel Gas System and PDCS of Kish Gas Refinery

The project is known as the Kish Gas Field Development. The overall project facilities will produce, treat, transport and export reservoir fluids from a gas field located near Kish Island which is situated in north part of Persian Gulf and near to Hormozgan province.
Arya Petro Gas scope of work includes engineering & procurement of three gas turbine centrifugal compressors of export unit, off-gas reciprocating compressors, API centrifugal pumps, MEG injection reciprocating pumps, fire water pumps, fuel gas system and PDCS of Kish Gas Refinery.
PEDEC 2010 .
9 110 Gas Dehydration Unit of Kish Gas Refinery (EP) Engineering & Procurement of Gas Dehydration Unit of Kish Gas Refinery

The project land is located on Persian Gulf shore in the Hormozgan province in Iran.
The onshore gas processing facility is a part of Kish Gas Field Development. Feed gas from sweetening unit enters to dehydration unit which consists of two identical trains with capacity of 500 MMSCFD each. Water content of inlet gas is 1001 ppm at the worst case which will be reduced to <0.1 ppm in the outlet of the unit. The unit is comprised of a number of molecular sieve beds. At any time a minimum of one molecular sieve bed shall be on regeneration and the rest on parallel adsorption to meet the water dew point specifications.
APG is responsible for endorsement of basic design, detailed engineering, procurement and supervision during construction, commissioning and start-up of the unit.
PEDEC 2010
10 109 Gas Export Unit, South Pars Phase 15, 16 (EPC) Engineering, Procurement and Construction of Gas Compressor Unit of South Pars Gas Field Phase 15 &16

The South Pars Gas Field Development Phase 15 &16 will be developed to produce 2 BSCFD reservoir fluids which will be reached in onshore facilities. Onshore processing facilities consist of condensate stabilization, NGL fractionation, gas treatment, propane and butane treatment, MEG regeneration, Sulfur recovery, export unit, etc. Export unit (Unit 106) is aimed to increase discharge pressure of treated lean Gas & boost it into gas trunk line for domestic and export purposes. In its 5+2 arrangement, each compression train includes one Centrifugal compressor and gas turbine driver, one suction drum, one after cooler and other required facilities.
POGC 2009
11 108 Abadan Refinery Upgrading Project (EPC) Engineering, Procurement and Construction of 11 Tanks of Abadan Refinery

Dismantling of 13 nos. of existing storage tanks, construction of eleven floating and fixed roof storage tanks with total capacity of 210,000 m3 and related facilities was including electrical substations, control system, tank gauging system, F&G system, fire fighting system, fuel pumps, utilities etc.
NIOEC 2007
12 107 Birjand Oil Tank Farm (EPC) Engineering, Procurement and Construction of Birjand Oil Tank Farm

Birjand Oil Tank Farm is comprised of thirteen tanks with total capacity of 700.000 bbl for storage of gasoline and gas oil. APG is responsible for engineering, supply of materials & equipment , civil works and construction of the tank farm and related facilities including loading/unloading arms, fuel transfer pump units, tank gauging system, F&G and fire fighting system, electrical substation ,etc.
NIOPDC 2006
13 106 Four Gas Compressor Stations of Azerbaijan 48'' Pipeline (P) Procurement Services & Supply of Piping, Mechanical & Machinery, Electrical, Control & Instrumentation Materials & Equipments

Natural gas received from the IGATs is boosted through Azerbaijan Pipeline to north and north west of the country for domestic consumption and export purposes. Qazvin, Khoramdarreh, Nikpei and Hashtrood Stations are aimed to enhance the capacity of the line from 60 MMSCMD to 110 MMSCMD. APG as a procurement contractor has supplied all piping, mechanical, electrical, control and instrumentation equipment and materials needed for execution of the stations. The overall process of the job including procurement engineering, PO placing, shipment, custom clearance and delivery of the goods at client's sites were all done within 10 months.
NIGC 2005
14 105 Four Gas Compressor Stations of IGAT IV (MC) Management Consultant

APG as management consultant of this project involved in endorsement or basic design, review and verification of detail design and supervision on construction, commissioning and start-up of stations no. 5,6,7 & 8 of IGAT IV which are named Arsanjan, Safashahr, Abadeh and Shahreza respectively.
NIGC 2005
15 104 Nikpey Gas Compressor Station Of Azerbaijan 48" Pipeline (C) Construction, Commissioning & Start-up

Civil works, installation, pre- commissioning, commissioning and start-up of the Station
NIGC 2005
16 103 Qazvin Gas Compressor Station of Azerbaijan 48" Pipeline (C) Construction, Commissioning & Start-up

Civil works, installation, pre- commissioning, commissioning and start-up of the Station
NIGC 2005
17 102 Khoramdarreh Gas Compressor Station of Azerbaijan 48" Pipeline (C) Construction, Commissioning & Start-up

Civil works, installation, pre- commissioning, Commissioning and start-up
NIGC 2005
18 101 Shanoul Manifold (EPC) Procurement of Material & Equipments, Construction, Commissioning & Start-up

Shanoul Manifold is aimed to gather natural gas from ten wells and transfers it to Persian refinery via 24" pipeline. APG has done engineering and design. procurement of all piping, fixed and rotary equipment, electrical, control and Instrumentation materials, civil works and construction of Shanoul Manifold within 17 months
ICOFC 2004