Row Code Title Scope of Works/Services Client Date
1 118 Deylam   & Bidboland Gas Compressor Stations Deylam &   Bidboland Gas Compressor Stations IGEDC 2016
Procurement   , construction , Instalaition and commissioning of Iranian Gas Trunk Pipeline   (IGAT6) Deylam & Bidboland Gas compressor stations .The capacity is   delivering and boosting natural gas by 110 milion cubic meter .Duration of   project is 19 Mounths and located in Bousher & Ahwaz .
2 117 Danan Oil   Field Development Danan Oil Field   Development Iranian Central Oil   Fields Company (ICOFC) 2015
Procurement,   Construction, Installation of Danan Separation Area included Gas   transportation line to Dehloran Gas Compressor station, Duration of project   is 18 months, and it is located in Dehloran City, in Ilam province.
3 116 Procurement   of Khangiran wellhead facilities and pipeline (E034S) and (E120s) Procurement of   Khangiran wellhead facilities and pipeline Iranian Central Oil   field CO. 2014 .
Arya   Petro Gas Global Co. has successfully achieved to conclude a new contract for   Procurement and Construction (PC) of Khangiran well head facilities and   pipeline with Iranian Central Oil Field Co (ICOFC). Duration of project is   about 12 months, and it is located in Khangiran City, in Khorasan province.   Scope of work included procurement of Khangiran well head facilities and   construction of 8'' underground pipeline.
4 115 Procurement   of Tabnak wellhead facilities and pipeline Project Procurement   of Tabnak wellhead facilities and pipeline Iranian Central Oil   field CO. 2014
Scope   of work included procurement and construction of Tabnak wellhead facilities   and underground pipeline with dimension of 8 inches.
5 114 Sirjan   Pipeline, Reducing & Metering Stations Project Sirjan Pipeline,   Reducing & Metering Stations Project Gohar Energy Sirjan Co. 2013
Procurement   and Supply of Equipment & Materials and Construction of 46 K.M of   Pipeline with specification of 2" to 24" along with Procurement   & Construction of 13 reduction & metering stations.
6 113 Yadavaran   Oil Field Development Engineering &   Procurement of Diesel Generator, Pig launcher & Receiver, Wellhead   Control Panel & Multi phase flow meter (Provision of Early Production   System Long Lead Items & Service) Sinopec/PEDEC 2010 .
The Yadavaran oil field is in south western Iran near the Iraq   border. It will be developed from two gathering manifold sites.The EPS will   include the drilling and hooking-up of 8 wells via 8'' buried flow lines to   manifolds located at Khusk and Hosseinieh (4 wells per manifold). An above   ground 10 km x 12'' infield line from each manifold will be connected to the   GOSU/CTEP area where the two lines will be joined via a pig gable ''Y'' piece   to a 12'' above ground pipeline to a termination point some 500 meters from   the boundary fence of the existing facility located some 45km south east of   Yadavaran.Arya Petro Gas scope of work includes engineering, procurement,   commissioning, start-up and training of client personnel for Diesel   Generator, Pig launcher & Receiver, Multiphase Flow Meter, Wellhead   Control Panel of Yadavaran oil field project.
7 112 Yadavaran   Oil Field Development Engineering &   Procurement of Pressure vessel needed for Yadavaran Oil Field Development   (Phase one) Sinopec/PEDEC 2010 .
The Yadavaran oil field is in south western Iran near the Iraq   border. It will be developed from two gathering manifold sites. The produced   crude will be transported to a Gas/Oil Separation Unit and Central Treatment   Export Plant (GOSU/CTEP). The crudes (heavy and light oil) are processed   separately. The processed crudes and excess gas will be exported separately   to the Ahwaz Booster Station (ABS) and a tie-in point near ABS respectively   about 100km away.Arya Petro Gas scope of work includes engineering,   procurement, commissioning, and start-up of pressure vessel of Yadavaran oil   field project.
8 111 Kish Gas   Refinery (EP) Engineering &   Procurement of Centrifugal Compressors, Reciprocating Compressors,   Centrifugal Pumps, Reciprocating Pumps, Fire Water Pumps , Fuel Gas System   and PDCS of Kish Gas Refinery PEDEC 2010 .
The project is known as the Kish Gas Field Development. The   overall project facilities will produce, treat, transport and export   reservoir fluids from a gas field located near Kish Island which is situated   in north part of Persian Gulf and near to Hormozgan province.Arya Petro Gas   scope of work includes engineering & procurement of three gas turbine   centrifugal compressors of export unit, off-gas reciprocating compressors,   API centrifugal pumps, MEG injection reciprocating pumps, fire water pumps, fuel   gas system and PDCS of Kish Gas Refinery.
9 110 Gas   Dehydration Unit of Kish Gas Refinery (EP) Engineering &   Procurement of Gas Dehydration Unit of Kish Gas Refinery PEDEC 2010
The project land is located on Persian Gulf shore in the   Hormozgan province in Iran.
The onshore gas processing facility is a part of Kish Gas Field   Development. Feed gas from sweetening unit enters to dehydration unit which   consists of two identical trains with capacity of 500 MMSCFD each. Water   content of inlet gas is 1001 ppm at the worst case which will be reduced to   <0.1 ppm in the outlet of the unit. The unit is comprised of a number of   molecular sieve beds. At any time a minimum of one molecular sieve bed shall   be on regeneration and the rest on parallel adsorption to meet the water dew   point specifications.APG is responsible for endorsement of basic design,   detailed engineering, procurement and supervision during construction,   commissioning and start-up of the unit.
10 109 Gas Export   Unit, South Pars Phase 15, 16 (EPC) Engineering,   Procurement and Construction of Gas Compressor Unit of South Pars Gas Field   Phase 15 &16 POGC 2009
The South Pars Gas Field Development Phase 15 &16 will be   developed to produce 2 BSCFD reservoir fluids which will be reached in   onshore facilities. Onshore processing facilities consist of condensate   stabilization, NGL fractionation, gas treatment, propane and butane   treatment, MEG regeneration, Sulfur recovery, export unit, etc. Export unit   (Unit 106) is aimed to increase discharge pressure of treated lean Gas &   boost it into gas trunk line for domestic and export purposes. In its 5+2   arrangement, each compression train includes one Centrifugal compressor and   gas turbine driver, one suction drum, one after cooler and other required   facilities.
11 108 Abadan   Refinery Upgrading Project (EPC) Engineering,   Procurement and Construction of 11 Tanks of Abadan Refinery NIOEC 2007
Dismantling of 13 nos. of existing storage tanks, construction   of eleven floating and fixed roof storage tanks with total capacity of   210,000 m3 and related facilities was including electrical substations,   control system, tank gauging system, F&G system, fire fighting system,   fuel pumps, utilities etc.
12 107 Birjand Oil   Tank Farm (EPC) Engineering,   Procurement and Construction of Birjand Oil Tank Farm NIOPDC 2006
Birjand Oil Tank Farm is comprised of thirteen tanks with total   capacity of 700.000 bbl for storage of gasoline and gas oil. APG is   responsible for engineering, supply of materials & equipment , civil   works and construction of the tank farm and related facilities including   loading/unloading arms, fuel transfer pump units, tank gauging system,   F&G and fire fighting system, electrical substation ,etc.
13 106 Four Gas   Compressor Stations of Azerbaijan 48'' Pipeline (P) Procurement Services   & Supply of Piping, Mechanical & Machinery, Electrical, Control &   Instrumentation Materials & Equipments NIGC 2005
Natural gas received from the IGATs is boosted through   Azerbaijan Pipeline to north and north west of the country for domestic   consumption and export purposes. Qazvin, Khoramdarreh, Nikpei and Hashtrood   Stations are aimed to enhance the capacity of the line from 60 MMSCMD to 110   MMSCMD. APG as a procurement contractor has supplied all piping, mechanical,   electrical, control and instrumentation equipment and materials needed for   execution of the stations. The overall process of the job including procurement   engineering, PO placing, shipment, custom clearance and delivery of the goods   at client's sites were all done within 10 months.
14 105 Four Gas   Compressor Stations of IGAT IV (MC) Management Consultant NIGC 2005
APG as management consultant of this project involved in   endorsement or basic design, review and verification of detail design and   supervision on construction, commissioning and start-up of stations no. 5,6,7   & 8 of IGAT IV which are named Arsanjan, Safashahr, Abadeh and Shahreza   respectively.
15 104 Nikpey Gas   Compressor Station Of Azerbaijan 48" Pipeline (C) Construction,   Commissioning & Start-up NIGC 2005
Civil works, installation, pre- commissioning, commissioning and   start-up of the Station
16 103 Qazvin Gas   Compressor Station of Azerbaijan 48" Pipeline (C) Construction,   Commissioning & Start-up NIGC 2005
Civil works, installation, pre- commissioning, commissioning and   start-up of the Station
17 102 Khoramdarreh   Gas Compressor Station of Azerbaijan 48" Pipeline (C) Construction,   Commissioning & Start-up NIGC 2005
Civil works, installation, pre- commissioning, Commissioning and   start-up
18 101 Shanoul   Manifold (EPC) Procurement of   Material & Equipments, Construction, Commissioning & Start-up ICOFC 2004
Shanoul Manifold is aimed to gather natural gas from ten wells   and transfers it to Persian refinery via 24" pipeline. APG has done   engineering and design. procurement of all piping, fixed and rotary   equipment, electrical, control and Instrumentation materials, civil works and   construction of Shanoul Manifold within 17 months